000 | 00419pam a2200133a 44500 | ||
---|---|---|---|
082 |
_aUSBM _bRI-7553 |
||
100 | _a | ||
245 | 1 | _aA THREE-DIMENSIONAL DYNAMIC PROGRAMING METHOD FOR OPTIMAL ULTIMATE OPEN PIT DESIGN | |
260 |
_a _bU. S. Dept. Of The Interior, Bureau Of Mines, [S. L.] _c1971 |
||
300 | _a25 | ||
500 | _aBound With Usbm Ri-7551-7552,7554-7570,Lack No. 7565 | ||
964 | _gCIRC | ||
997 | _aTR15226 C | ||
999 |
_c400098 _d400098 |