000 00518pam a2200133a 44500
082 _aTR
_bNAL-25-64
100 _aArora,L. N.
245 1 _aCELIBRATION OF THE 5 IN X 5 IN INDUCTION TUNNEL WITH 2 IN X 10 IN TEST SECTION HAVING NORMAL HOLE PERFORATED WALLS AND WITHOUT PLENUM AUXILIARY SUCTION
260 _a
_bNational Aeronautical Laboratory, Bangalore
_c1964
440 _aNational Aeronautical Laboratory -Tn -Ae-25-64
_v
500 _aBound With: Nal Bangalore-Tn-Ae-25-64
964 _gCIRC
997 _aTR3736 C
999 _c392457
_d392457