000 | 00518pam a2200133a 44500 | ||
---|---|---|---|
082 |
_aTR _bNAL-25-64 |
||
100 | _aArora,L. N. | ||
245 | 1 | _aCELIBRATION OF THE 5 IN X 5 IN INDUCTION TUNNEL WITH 2 IN X 10 IN TEST SECTION HAVING NORMAL HOLE PERFORATED WALLS AND WITHOUT PLENUM AUXILIARY SUCTION | |
260 |
_a _bNational Aeronautical Laboratory, Bangalore _c1964 |
||
440 |
_aNational Aeronautical Laboratory -Tn -Ae-25-64 _v |
||
500 | _aBound With: Nal Bangalore-Tn-Ae-25-64 | ||
964 | _gCIRC | ||
997 | _aTR3736 C | ||
999 |
_c392457 _d392457 |