000 | 00839pam a2200157a 44500 | ||
---|---|---|---|
008 | 160408b2009 xxu||||| |||| 00| 0 eng d | ||
040 | _aIIT, Kanpur | ||
082 |
_a658.56 _bH613j2 |
||
100 | _aHirano, Hiroyuki | ||
245 | 1 |
_aJIT implementation manual _bthe complete guide to just-in-time manufacturing (6 vol. set) _cHiroyuki Hirano |
|
250 | _a2nd | ||
260 |
_aBoca Raton _bCrc Press _c2009 |
||
300 | _axv, 144p | ||
505 | _aContents: V.1 The just-in-time production system V.2 Waste and the 5S's V.3 Flow manufacturing multi-process operations and kanban V.4 Leveling changeover and quality assurance V.5 Standardized operations-jidoka and maintenance/safety V.6 JIT implementation forms and charts | ||
997 | _aA165386 v.1 C A165387 v.2 C A165388 v.3 C A165389 v.4 C A165390 v.5 C A165391 v.6 C | ||
999 |
_c364116 _d364116 |