SCHEDULE, COST AND PROFIT CONTROL WITH PERT
By: Miller, Robert Wallace.
Material type: BookPublisher: N. Y. Mcgraw-Hill 1963Description: 227.Subject(s): Critical Path AnalysisDDC classification: 658.5018 | M617sItem type | Current location | Collection | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
Books | PK Kelkar Library, IIT Kanpur | General Stacks | 658.5018 M617s (Browse shelf) | Available | 53612 |
Total holds: 0
Browsing PK Kelkar Library, IIT Kanpur Shelves , Collection code: General Stacks Close shelf browser
658.5018 H117a ANALYSIS OF INVENTORY SYSTEMS | 658.5018 M171p PRODUCTION AND LOGISTICS MANAGEMENT | 658.5018 M366f PROJECT MANAGEMENT AND CONTROL | 658.5018 M617s SCHEDULE, COST AND PROFIT CONTROL WITH PERT | 658.5018 M72p PROJECT MANAGEMENT WITH CPM AND PERT | 658.502 D413 SYSTEMS ANALYSIS FOR ENGINEERS AND MANAGERS | 658.502 R831s STRATEGY OF PROCESS ENGINEERING |
There are no comments for this item.